Hawkstone 1A
32168
portfolio_page-template-default,single,single-portfolio_page,postid-32168,stockholm-core-2.3.2,ctct-stockholm,select-theme-ver-9.12,ajax_fade,page_not_loaded,side_area_uncovered,,qode_menu_,wpb-js-composer js-comp-ver-8.1,vc_responsive
  • Ripa Construction Hawkstone 1A Project Drone Photo.
  • Ripa Construction Hawkstone 1A Project Drone Photo.
  • Ripa Construction Hawkstone 1A Project Drone Photo.
  • Ripa Construction Hawkstone 1A Project Drone Photo.
  • Ripa Construction Hawkstone 1A Project Drone Photo.
  • Ripa Construction Hawkstone 1A Project Drone Photo.

Hawkstone 1A

Hawkstone 1A is a large single-family residential subdivision in the ever-growing Riverview/Fishhawk region. The project has over 500,000 cubic yards of excavation and nearly 2 miles of sanitary, storm, and pressure pipe installation each. This phase of the subdivision has over 200 lots, with 44 of those lots expedited to meet the client’s goal of starting home construction early. This site was an existing strawberry farm, so the demo/site prep was quite challenging. The RIPA & Associates crew did a great job of locating and removing all existing conditions, which contributed to the early success of the site.

Location (county): Hillsborough
Work Type: Residential