Wiregrass Ranch Boulevard
24528
portfolio_page-template-default,single,single-portfolio_page,postid-24528,stockholm-core-2.3.2,ctct-stockholm,select-theme-ver-9.12,ajax_fade,page_not_loaded,side_area_uncovered,,qode_menu_,wpb-js-composer js-comp-ver-8.0,vc_responsive
  • RIPA & Associates Construction Wiregrass Ranch Blvd Project Drone Photo.
  • RIPA & Associates Construction Wiregrass Ranch Blvd Project Drone Photo.
  • RIPA & Associates Construction Wiregrass Ranch Blvd Project Drone Photo.
  • RIPA & Associates Construction Wiregrass Ranch Blvd Project Drone Photo.
  • RIPA & Associates Construction Wiregrass Ranch Blvd Project Drone Photo.

Wiregrass Ranch Boulevard

Wiregrass Ranch Blvd extension will connect the existing Wiregrass Ranch Blvd at SR-56 to Chancey Road. This connection will prove be a major thoroughfare for future residents of the thriving Wiregrass area. The project consists of over a mile of collector road with three feature roundabouts. RIPA will also be installing the associated drainage and reclaim main. There are several existing utilities that were previously installed including a 16” watermain and 20” forcemain; which will have to be worked around and maintained as the new roadway is constructed. This project is currently being fast tracked and scheduled for an early 2017 completion.