Venice Woodlands

Venice Woodlands is conveniently located 4.5 miles from the new RIPA office in North Venice, Florida. This project will be developed into 263 lot subdivision on the 151-acre site. Meritage Homes, the property owner contacted RIPA to fast track the project to completion.

Due to the heavy vegetation and high ground water this project was difficult on the front end. Venice Woodlands is the furthest south project for RIPA. This project supports the expansion of RIPA to opening the second office in the southern region

Cypress Mill

Cypress Mill is a master-planned community located in Ruskin, Florida. This fast track project included the installation of two lift stations with over one million CY of dirt moved, and over 7 miles of utilities were installed.

In addition, Cypress Mill had large scale off-site lane widening and two new traffic signals added to the entrance of the development. Lennar Homes is the land owner and Clearview Land Development is the engineer that RIPA worked with to complete the project on time and on budget

Aprile Farms

Aprile Farms is a mixed-use development site on approximately 36 acres of land. Located at U.S. 301 and I-4 in Hillsborough County, this project required the cooperation of many municipalities in order to get the project completed on time and budget. Utility work along U.S. 301 required coordination with the City of Tampa, Florida Department of Transportation and Hillsborough County, all of which owned or operated facilities on right of ways in the work area.

Difficult soil and groundwater conditions were cause for concern and dictated the earthwork operations. Due to the loading requirements of large industrial buildings, RIPA contracted Hayward Baker to perform soil improvements. RIPA is contracted under the GC, Conlan Company, and is expected to complete the project in June of 2019.

Costco At Citrus Park

The 3rd Costco in the Tampa Bay area, RIPA was chosen for this high-profile project due to the quality work we perform. Located at the busy intersection of Linebaugh and Sheldon in the heart of Westchase, RIPA completed site development in 2016.

Cypress Creek High School

With the continued surging growth in Pasco County, school officials put into motion the building of several schools, including High School GGG. The initial plan estimated the overall project would be $85 million. RIPA will be involved in most phases of the infrastructure development of this new school that will help with the overcrowding problem in Pasco.

RIPA will: move 335,000CY of dirt, install 225,000SF of pond liners, install 34,000LF of underground utilities (which includes almost 5,000LF of roof/yard drains) and 210,000SF of concrete sidewalk. Asphalt paving totals are 65,000SY for drives and parking, and also includes the running track and field event surfaces and basketball courts.

Publix Southshore

As a subcontractor to Hawkins Construction, RIPA provided clearing, grading, underground utilities, concrete, and asphalt paving for this project. Located at 19th Avenue and U.S. Highway 41 in Ruskin, the 46,000 SF Publix was
completed in 2016.

Ifly

iFly is a unique indoor skydiving facility that is located in a fast-growing entertainment and shopping corridor adjacent to Top Golf and Bass Pro Shops in Brandon. This project required challenging excavation & dewatering for the massive, thirty-foot-deep pit which houses the facility’s fan system in the substructure of the building. iFly’s grand opening was in 2018.

Wiregrass Ranch Boulevard

Wiregrass Ranch Blvd extension will connect the existing Wiregrass Ranch Blvd at SR-56 to Chancey Road. This connection will prove be a major thoroughfare for future residents of the thriving Wiregrass area. The project consists of over a mile of collector road with three feature roundabouts. RIPA will also be installing the associated drainage and reclaim main. There are several existing utilities that were previously installed including a 16” watermain and 20” forcemain; which will have to be worked around and maintained as the new roadway is constructed. This project is currently being fast tracked and scheduled for an early 2017 completion.

Tapestry Brandon

Tapestry at Lake Park is an Apartment complex located in northern Hillsborough County for Arlington Properties. This multi-family complex is made up of seven apartment buildings, nine apartment carriage buildings, and a clubhouse amenity center. This project required 42,000 CY of import fill with over 11,000 CY of onsite excavation. RIPA installed approximately 3,600 LF of storm drain, 2,000 LF of sanitary sewer pipe and 3,500 LF of water main utility pipe.

Tampa Regional Industrial Park (T R I P)

Tampa Regional Industrial Park or T.R.I.P for short, is a light Industrial Facility located at US41 and Big Bend Road in Gibsonton. The project is being constructed for Duke Realty who functions not only as the property owner but also as the land developer and General Contractor for the project. The project consists of a 330,000 SF dock high warehouse building with associated roadways and parking facilities. Ripa’s scope of work for the project includes 150,000 CY of onsite excavation, sanitary sewer system and lift station, domestic water and fire suppression lines, an extensive storm drainage system and approx. 8 acres of roadways and parking areas. Also included are upgrades to the offsite roadways along both Big Bend Road and US41. The project is scheduled for completion in May of 2017.